Offshore
Foundation design and analyses related to the installation of offshore platforms and marine structures. Harbours, trestles and near-shore works

Skip to main content

Home / Offshore / Costa Concordia wreck removal

Offshore main projects

Costa Concordia wreck removal

Job

Geological/geotechnical design of foundations

Project Phase

CP

Date

2012 - 2013

Amount

300 millions

Our Client

TECON Srl, Titan Micoperi

Main Client

Carnival Corp. / Insurance companies

Job Description

The design consists of a preliminary making safe of the Costa Concordia wreck and the subsequent restoration of floating condition. SOIL srl have been appointed to undertake the geological and geotechnical assesment for the design of foundations and anchoring structures. www.theparbucklingproject.com

Gallery



Project Phase, legend:

  • FEED Front End Engineering Design
  • PF Pre-FEED
  • DD Detailed Design
  •  
  • CP Construction Phase
  • AT Assistenza Tecnica
  • WS Works Supervision
logo soil

Costa Concordia Parbuckling

For the purposes of the safe removal of the Costa Concordia wreck, SOIL Srl has been involved into all aspects concerning the geological and geotechnical design and assistance for the construction of the foundation structures.

The Costa Concordia Wreck Removal Project foresaw in the first stage the rotation of the wreck to its vertical position (parbuckling phase) and subsequently its re-floating by means of the installation of steel caissons on both sides of the ship.

The parbuckling required the construction of underwater anchoring structures on the landward side of wreck and the installation of three submerged platforms for its temporary support in vertical position on the seaward side. The structures were built respectively at water depths of 5 ÷ 10m and 40 ÷ 50m below sea level. Drilled steel piles (D = 2m) were designed for the platforms foundations.

The activities performed by SOIL Srl concerned:

Working Group

Project Leaders:
Eng. Luigi Albert: general management, geotechnical design of foundation structures;
Geol. Fabio Staffini: design team coordinator, geological design and geomechanical modeling.

Design team:
Eng. Angelo Lambrughi: technical supervision during the investigation surveys, geomechanical modeling of the anchor blocks and technical supervision during construction and testing of the foundation structures;
Eng. Pietro Coppola: geomechanical modeling for the piles of the sea side platforms;
Eng. Davide Spinelli: geotechnical design of foundation structures;
Geol. Marta Senaldi: geological mapping, geological and geomechanical design.
Eng. Alessandro Bonasio: morpho bathymetric modelling and CAD drawings.

 

Consultants:
Prof. Eng. Giancarlo Gioda: geomechanical modeling of fractured rock masses around the piles;
Prof. Geol. Giorgio Pasquaré: general geological survey of the onshore areas;
Geol. Teodoro Aldo Battaglia: geological survey and assistance for the positioning of the anchor blocks;