Home / Projects / A3 Salerno-Reggio Calabria Highway Lot 3 Part 2nd

Latest projects

A3 Salerno-Reggio Calabria Highway Lot 3 Part 2nd

Job

ASR 18/07 - Autostrada A3 Salerno Reggio Calabria - Works of modernization and adjustment to "1a" type of CNR/80 regulation from km 153+400 to km 173+900 - Macrolotto 3 parte 2a

Project Phase

DD

Date

2013 - In progress

Amount

Our Client

ITALSARC (Ghella, CMB)

Main Client

ANAS S.p.A.

Job Description

Geotechnical and structural design of the foundations of n.6 viaducts (Jannello, Italia, Filomato, Mezzana, Battendiero III, Castagne), including the provisional works.



Project Phase, legend:

  • FEED Front End Engineering Design
  • PF Pre-FEED
  • DD Detailed Design
  •  
  • CP Construction Phase
  • AT Assistenza Tecnica
  • WS Works Supervision
logo soil

Costa Concordia Parbuckling

For the purposes of the safe removal of the Costa Concordia wreck, SOIL Srl has been involved into all aspects concerning the geological and geotechnical design and assistance for the construction of the foundation structures.

The Costa Concordia Wreck Removal Project foresaw in the first stage the rotation of the wreck to its vertical position (parbuckling phase) and subsequently its re-floating by means of the installation of steel caissons on both sides of the ship.

The parbuckling required the construction of underwater anchoring structures on the landward side of wreck and the installation of three submerged platforms for its temporary support in vertical position on the seaward side. The structures were built respectively at water depths of 5 ÷ 10m and 40 ÷ 50m below sea level. Drilled steel piles (D = 2m) were designed for the platforms foundations.

The activities performed by SOIL Srl concerned:

Working Group

Project Leaders:
Eng. Luigi Albert: general management, geotechnical design of foundation structures;
Geol. Fabio Staffini: design team coordinator, geological design and geomechanical modeling.

Design team:
Eng. Angelo Lambrughi: technical supervision during the investigation surveys, geomechanical modeling of the anchor blocks and technical supervision during construction and testing of the foundation structures;
Eng. Pietro Coppola: geomechanical modeling for the piles of the sea side platforms;
Eng. Davide Spinelli: geotechnical design of foundation structures;
Geol. Marta Senaldi: geological mapping, geological and geomechanical design.
Eng. Alessandro Bonasio: morpho bathymetric modelling and CAD drawings.

 

Consultants:
Prof. Eng. Giancarlo Gioda: geomechanical modeling of fractured rock masses around the piles;
Prof. Geol. Giorgio Pasquaré: general geological survey of the onshore areas;
Geol. Teodoro Aldo Battaglia: geological survey and assistance for the positioning of the anchor blocks;
Geol. Andrea Rossotti: diving assistance for the positioning of the anchor blocks.